The Stebel Magnum Horn will bolt right into the existing position with some careful manouvering, and the purchase of the Can-Bus wiring kit.
Stebel Magnum Horn 136dB £15.00
http://www.nippynormans.com/prodinfo.asp?number=STB-MAG&variation=&aitem=2&mitem=9
Can-Bus wiring kit from Nippy Normans £15.00
http://www.nippynormans.com/prodinfo.asp?number=STB-CANBUSKIT&variation=&aitem=1&mitem=9
These 3 T25 bolts need to be removed from around the glove box.
This single long T25
These 3 T25's from lower fairing
There are 4 x T25's from around the Radiator
The Top T25 is hidden by the Air filter ram
This is the exposed RHS of bike
Top T30 needs to be removed from above the computer
T30 just above Engine Radiator filler cap & to the left
Remove T40 horn bolt from above the 2 Oil cooler pipes
Silver caged nut needs to be moved from BMW horn mounting to Stebel mounting.
You can see the Black Stebel horn mounted and also catch a view of steering damper above, Silver Hydraulic clutch pipe passes just left of the horn assembly.
No comments:
Post a Comment